Big Bass Chris Designs

Newport Carbon Fiber Steering Triangle & Lift Arm Kit

🎯 Compatibility

Designed for Newport Vessels NK Series (NK300, NK180, NK180PRO) trolling motors

📹 Installation Video

Watch a third-party installation demonstration while we prepare our own tutorial

▶️ Watch Installation Video

Step-by-Step Installation Guide

1

Remove the Stock Lift Arm

  • Ensure the original stock steering triangle is securely in place via the bottom screw and nut.
  • Remove the top screw holding the stock lift arm.

⚠️ Important

Keep the bottom screw and nut in place - you'll need the stock steering triangle as a base for the carbon fiber upgrade.

2

Install the Carbon Fiber Lift Arm

  • Insert the carbon fiber lift arm into place.
  • Reinstall the screw and nut, tightening them firmly.
3

Position the Carbon Fiber Steering Triangle

  • Place the carbon fiber steering triangle on top of the stock plastic steering triangle.
  • Insert the provided screws into the two front (bow-end) holes, but do not fully tighten them yet.

⚠️ Do Not Fully Tighten Yet

Only hand-tighten the screws in this step - you'll need to adjust positioning in the next step.

4

Secure the Carbon Fiber Triangle

  • Push the carbon fiber triangle as far forward as possible.
  • Fasten it to the stock plate using the installed screw and provided locking nut.
  • Positioning it fully forward ensures additional support for the rear (stern-side) of the lift arm.

🔧 Pro Tips

Need Help?

Questions about installation? We're here to provide personalized support.